TRA Transport

1500 TRA Transport

Regulation 18 stage

1500.1 Icon for pdf Uttlesford District Transport Study December 2016 [18.18MB]

1500.2 Icon for pdf District Transport Study - Technical Notes [11.4MB]

1500.3 Icon for pdf District Transport Study Addendum including Saffron Walden study update (June 2017) [5.0MB]

1500.4 Icon for pdf South Cambs Junction Assessments [8.77MB]

1500.5 Icon for pdf Uttlesford District Council District Wide Transport Study Consultation Summary [1.55MB]

1500.6 Icon for pdf Uttlesford District Council District Wide Transport Study Consultation UDC Response [1.42MB]

Regulation 19 stage

1500.7  Uttlesford Local Plan Transport Study Addendum Report 2 (May 2018) [12MB]

1500.8 Icon for pdf Cambridgeshire County Council Position Statement on UDC Local Plan (CCC Transport Assessment Team June 2018) [101.54KB]

1500.9    Uttlesford District Council District Wide Transport Study Technical Note 7; Sensitivity Testing - Scenarios 30, 31 & 32 [3.24MB]

1500.10  Uttlesford District Council District Wide Transport Study Technical Note 8; Revised Sensitivity Testing [4.17MB]

1500.11 Icon for pdf Revised Technical Note 5 Sustainable Travel [1009.7KB]

1500.13  Uttlesford Local Plan - Site Accessibility Scoring Matrix [57KB]

1500.14  A505 Corridor Improvement Feasibility  Study A10 to the A11 (January 2018) [3.47MB]

1500.15 Icon for pdf Great Dunmow Council queries to the PPWG with UDC response [500.22KB]

1500.16 Icon for pdf District Wide Transport Study Technical Note 9 - A120(T) / A120 Corridor Mitigation Strategy [7.28MB]

1501 TRA Uttlesford Cycling Strategy (Essex County Council October 2014)

1501.1 Icon for pdf Uttlesford Cycling Strategy [5.94MB]

1501.2 Icon for pdf Uttlesford Cycling Action Plan (ECC March 2018) [4.66MB]

1501.3 Icon for pdf Great Chesterford Cycle Route Feasibility Study (Essex Highways April 2014) [4.99MB]

1502 TRA Local Plan Highway Impact Assessment (Essex Highways March 2014)

1502.1 Icon for pdf Local Plan Highway Impact Assessment to 2031 (Essex Highways March 2014) [6.47MB]

1503 TRA Local Plan Highway Impact Assessment (Essex Highways October 2013)

1503.1 Icon for pdf Local Plan Highway Impact Assessment (Essex Highways October 2013) [6.47MB]

1503.2 Icon for pdf Local Plan Highway Impact Assessment Appendices [11.39MB]

1504 TRA Essex Local Transport Plan 2011 (Essex County Council)

1504.1  Essex Transport Strategy: The Local Transport Plan For Essex [768KB]

1505 TRA Comparative Transport Analysis (Essex County Council 2010)

1505.1 Icon for pdf Comparative Transport Analysis [1.59MB]

1505.2 Icon for pdf Comparative Transport Analysis Table [24.69KB]

1506 TRA Rapid Transit (January and June 2019)

1506.1 Icon for pdf Stansted to Braintree Rapid Transit System. Preliminary Concept and Feasibility Study (Ringway Jacobs & Essex County Council January 2019) [2.94MB]

1506.2 Icon for pdf Mass Transit Opportunities (NUGC Promotor); Peter Brett Associates - Stantec (January 2019) [2.4MB]

1506.3 Icon for pdf Bus Rapid Transit for Uttlesford - Supplementary Technical Study (21 June 2019) [2.5MB]